NABH & HTM Compliant

Engineering the Future of Knee Replacement Care

Design, Supply, and Commissioning of 02 Advanced Modular Operation Theatres delivered in a record-breaking 28 days at Max Hospital, Saket.

28

Days Deliver

02

Mod-OT Units

ot table - main

Client

Max Hospital, Saket

Location

New Delhi, India

Project Type

Brownfield Building

Application

Orthopaedic Specialization

Comprehensive Execution Scope

Our multidisciplinary approach ensured a turnkey solution covering structural, mechanical, and medical systems.

Modular OT System

High-quality Steel Panels with 100% modular antibacterial powder coating finish.

MGPS Solutions

Medical Gas Pipeline System compliant with HTM 02-01 / NFPA 99 for O2, N2O, Air, and Vacuum.

HVAC & Cleanroom

Dedicated AHUs with HEPA H14 filters ensuring 99.97% air purity at 0.3 microns.

Electrical Safety

Power Supply Isolation Panels (IPS) and UPS connectivity for uninterrupted surgical power.

Hermetic Systems

Automatic sliding hermetically sealed OT doors with 99% sealing efficiency.

Digital Integration

BMS monitoring for temp/humidity and 55-inch PACS medical-grade monitors.

Uncompromising Technical Excellence

Every component was selected to meet the rigorous demands of high-precision orthopaedic surgeries, prioritizing infection control and surgeon ergonomics.

Standard Compliance
NABH Grade Surgical Environment
Modular Wall and Ceiling

The 28-Day Challenge

Executing two high-complexity OTs within a fully functional hospital environment is usually a 90-day task. We did it in 28, without disturbing a single patient.

Impossible Timeline

Achieving commissioning within just 4 weeks while maintaining stringent medical standards and certifications.

Active Hospital Environment

Brownfield site execution where ongoing medical services for admitted patients could not be interrupted.

Strategic Strategy

Night-Shift Dominance

Shift-based workforce rotation allowing heavy construction while patients slept.

Parallel Logistics

Off-site manufacturing of modular components synchronized with site prep.

Real-time Validation

Concurrent testing of HVAC and MGPS systems to avoid post-completion delays.

Rapid Delivery Roadmap

28 days from site handover to full operational readiness.

Site Prep & Structural

Civil works, night-shift demolition, and base structural support installation.

Modular Integration

Steel panel erection, HVAC ducting, and MGPS piping backbone.

Mechanical & Finish

Hermetic doors, conductive flooring, and medical equipment mounting.

Validation & Handover

Particle count, HVAC validation, BMS calibration, and staff training.

Project Outcome

100%

Operational Readiness

Zero

Hospital Disruptions

NABH

Grade Compliant

The project delivered 2 state-of-the-art modular OTs optimized for Knee Replacement Surgeries, enhancing infection control, surgeon ergonomics, and patient safety protocols.